The Minack Chronicles Derek and Jeannie Tangye
             July 1st Derek makes a file note that Tommy had started work on the septic tank August 3rd Derek   then   recalls   that   ‘   The   septic   tank   is   finished   and   the   water      laid   on. All   we   require   is   the   hut   to   be   built   for   the bath and lavatory to be installed’
Copyright © Novagraphics 2006-2019  All Rights Reserved
The   ‘hut’   included   a   small   lobby,   bedroom   and   bathroom.   It   had   two doors, the one you see in both of these photos and one to the far left. You’ll notice that the roof was originally felt covered and tiled later.